Only twelve weeks until opening of Circle Theatre’s 2014-15 season finale, Calamity Jane, our very own, SuperTech started the first leg of the “scenic” journey.

With SuperTech still on doc’s orders to limit the use of his thumb, the decision was made to start the scenic painting of one of the soft drops. Within the weeks time, SuperTech, demonstrated once again, why he was given the titled of SuperTech.¬† Take a look from beginning to end of this week’s creation of the Fort Ballroom.

CALAMITY JANE | June 4-7, 2015 | The Orlando Repertory Edyth Bush Theatre

For tickets and more information, please click here.

 

SuperTech begins rolling the base coat of paint over the 18ft (h) x 35ft (w) soft drop.

SuperTech begins rolling the base coat of paint over the 18ft (h) x 35ft (w) soft drop.

Base coat down. Now to wait overnight.

Base coat down. Now to wait overnight.

The next day, SuperTech line draws the entire drop with charcoal and begins applying the first layer of many layers of paint.

The next day, SuperTech line draws the entire drop with charcoal and begins applying the first layer of many layers of paint.

The first layer of many layers of paint is complete.

The first layer of many layers of paint is complete.

The first layer of many layers of paint is complete.

The first layer of many layers of paint is complete.

The next step in the process is to begin painting in the "logs" of the fort.

The next step in the process is to begin painting in the “logs” of the fort.

The beginning stages of detail painting adding highlights and shadowing.

The beginning stages of detail painting adding highlights and shadowing.

 

Stage 2 is complete.

Stage 2 is complete.

Stage 3 begins with adding in even more details.

Stage 3 begins with adding in even more details.

SuperTech begins painting the windows.

SuperTech begins painting the windows.

Curtains are added to the windows.

Curtains are added to the windows.

The details of elk mount are starting to take shape.

The details of elk mount are starting to take shape.

More shadowing.

More shadowing.

A close-up shot of the details SuperTech adds to the elk's antlers, including shadows against the log wall.

A close-up shot of the details SuperTech adds to the elk’s antlers, including shadows against the log wall.

The gas lamps and fabric bunting details are added.

The gas lamps and fabric bunting details are added.

The gas lamps are finished.

The gas lamps are finished.

The elk mount has been completed.

The elk mount has been completed.

The next to the last day more details are given to the entire drop.

The next to the last day more details are given to the entire drop.

Door hinge detail

Door hinge detail

Rope detail

Rope detail

A detailed shot of the elk.

A detailed shot of the elk.

Drop is ready for the final wash to be added.

Drop is ready for the final wash to be added.

Drop is ready for the final wash to be added.

Drop is ready for the final wash to be added.

 Join us next week as we share week 2 of the Calamity Jane scenic build!